Design Buy Build

Main Menu

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Sign in / Join

Login

Welcome! Login in to your account
Lost your password?

Lost Password

Back to login

logo

Design Buy Build

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Latest News
Home›Latest News›Case Study: Porter & Rye, Glasgow

Case Study: Porter & Rye, Glasgow

By Jamie Bullock
July 12, 2017
1290
0

When they launched their new top flight steak restaurant Porter & Rye in Glasgow, owners Kained Holdings chose a natural, rustic look for the décor. However, an influx of cold air every time the door opened was definitely not on the menu.  Airbloc was called in to provide a HVAC solution that would keep draughts at bay and ensure a comfortable environment for diners.

Porter & Rye specialises in quality dry-aged meats and classic mixed drinks.  The restaurant occupies the ground floor of an elegant Georgian building on Argyle Street, close to the bustling West End, and incorporates a mezzanine.  It is in an exposed location, in as much as cold air is channelled along the street from Kelvin Grove Park directly towards the entrance.

Airbloc, which is part of Nortek Global HVAC, supplied an air curtain from its AC Chassis range. The electrically heated CMS1000HE12-SM unit delivers a powerful downflow of heated air to create comfortable conditions for staff and customers.  It is a highly energy-efficient HVAC solution, typically reducing, heat loss around an open door by up to 80%.

The CMS air curtain is suitable for a variety of commercial and retail applications and is intended for discreet positioning in suspended ceilings or doorway bulkheads.  However, Kained Holdings – which also operates a Porter & Rye restaurant in Edinburgh and Lebowski’s bar in Glasgow – deliberately chose to have the unit in full view.

The owners wanted an ‘industrial look’ to complement the overall décor, which makes a feature of the exposed stone and ironwork.  Airbloc therefore supplied the unit with an unpainted outlet and grille.  This not only created the aesthetic effect required, but also ensured that the flush, adjustable grille was a perfect match for the restaurant’s frameless glass door.

Mo Clark, Estates Director at Kained Holdings, said: “A warm and welcoming environment is vital if we are to attract and retain customers, so we had to find a way to counteract the cold winds that we experience in the Finneston area of Glasgow.

“The air curtain has solved the problem.  We can’t stop the wind from blowing but, thanks to Airbloc’s solution, there’s no noticeable impact on the comfort of diners when customers enter or leave the restaurant.  The unit is economical to run in its own right, and the building’s main heating system doesn’t have to work extra hard, which would result in an increase in our energy bills, to maintain the set temperature.”

The layout of the steelwork and structure of the doorway meant that the air curtain had to be mounted at high level.  This did not pose any difficulties in terms of installation, nor did it have an adverse impact on the effectiveness of the system because the CMS1000HE12-SM unit is suitable for installation at a height of four metres.

For improved energy management, the air curtain was installed in conjunction with Airbloc’s class-leading SmartElec controller.  Incorporating MODBUS protocol and digital sensors, the system allows closer control, enabling end users to save 40%-65% on their energy costs.

Installation Summary:

  • Non-typical application of the CMS unit
  • Unit deliberately chosen to create a visual impact
  • Mounted at 4m above the door

Technical Summary:

  • One CMS1000HE12-SM
  • A cost-effective HVAC solution, creating an effective barrier to draughts
  • Heat loss around open doors is reduced by up to 80%
  • Customised unpainted finish complements the restaurant’s décor
  • Powerful unit ideally suited to high-level mounting at up to 4m
  • Supplied with the SmartElec controller for improved energy management

This slideshow requires JavaScript.

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Facebook (Opens in new window) Facebook

Related

Previous Article

Radiant Electric Ceiling Heater Systems

Next Article

RINNAI – ANOTHER ‘STANDARD SET’ – OUT ...

Latest Issue



[Click Here to view the Low Res PDF version]

<center>
© Copyright Design Buy Build. All rights reserved.
 

Loading Comments...
 

    MH Media Global uses cookies to ensure the best user experience. If you do not wish to allow cookies, please click refuse.AcceptRefusePrivacy Policy