Design Buy Build

Main Menu

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Sign in / Join

Login

Welcome! Login in to your account
Lost your password?

Lost Password

Back to login

logo

Design Buy Build

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
industry news
Home›industry news›CTS Bridges Provide Missing Link

CTS Bridges Provide Missing Link

By Josh Holmes
May 30, 2014
1150
0

The new 151m long cable stay bridge in Ebbw Vale installed in March by CTS Bridges provides local people with safe access across the valley and connects the town with new leisure facilities and schools built on the site of a former steelworks. The area has been regenerated over the last 3-4 years with new leisure facilities and schools being built.  However, the local residents previously had to make a bus journey to get to the other side of the valley.  The new bridge enables people to access the schools and leisure facilities on a direct route.

 

The 151m long total length of the bridge comprises four spans of 47m, 50m, 30m and 24m.  These spans are supported with a 34m high cable tower and cables.   The cables connecting the bridge to the cable tower were tensioned using a Macalloy Techno Tensioner.

The installation of the bridge took place in March with some poor weather to contend with.  But luckily the sun was out on the day the main cable tower was erected.  Various sized cranes were used in the installation of the bridge including 500 tonne, 250 tonne, 150 tonne cranes and a 40m mechanical work platform.  CTS’s installation teams were on site for 2 weeks erecting the bridge spans.

CTS worked closely with main contractor Dawnus to deliver the bridge on a tight timescale in time for the opening in April 2014.

3920 Installation

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Facebook (Opens in new window) Facebook

Related

Previous Article

SAINT-GOBAIN FUNDS VITAL NURSING HOURS FOR PEOPLE ...

Next Article

THE ROOFING AWARDS – WINNERS REVEALED

Latest Issue



[Click Here to view the Low Res PDF version]

<center>
© Copyright Design Buy Build. All rights reserved.
 

Loading Comments...
 

    MH Media Global uses cookies to ensure the best user experience. If you do not wish to allow cookies, please click refuse.AcceptRefusePrivacy Policy