Design Buy Build

Main Menu

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Sign in / Join

Login

Welcome! Login in to your account
Lost your password?

Lost Password

Back to login

logo

Design Buy Build

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
industry newsLatest News
Home›industry news›Evinox Energy Future Proof Heat Interface Units

Evinox Energy Future Proof Heat Interface Units

By Jamie Bullock
August 19, 2015
3498
0

Your choice of Heat interface Unit (HIU), for dwellings connected to a communal or District heating network, is a crucial element of the system design. Installing the best solution from the outset can provide a more efficient and easy to manage scheme. With advances in technology and growing experience in system design, improved methods of controlling HIU’s and the primary network are available.

Our electronic control strategy

Our ModuSat® units use an advanced Proportional Integral Derivative (PID) control logic, in combination with PICV’s and a fast acting actuator, which modulate the primary flow rate to match the DHW or HTG demand, and respond instantly to the changing loads. This ensures that end user comfort is achieved by providing consistent, safe hot water at the tap, as well as guaranteeing the low return temperature to the primary network at all times.

The use of PID controlled PICV’s in HIU’s means that only one valve is required for differential pressure control, flow modulation and full energy shut off. This reduces the size and weight of the unit, keeps maintenance costs to a minimum and increases functionality.

In addition, Evinox Energy HIU’s are supplied prepayment ready as standard, with a room controller for the end user, meaning there is no requirement for additional controls, sensors or equipment to switch the end user to a debt free Pre-Payment system. The integrated technology also enables remote monitoring for diagnostics and improving the efficiency of the system.

Evinox Energy are confident that the future of HIU’s lies in electronically controlled units that provide full comfort to the end user, whilst also delivering important information regarding the operation of the system, which can be monitored, adjusted or regulated remotely over the internet.

_GH80305 LR

Evinox Energy Ltd
Blenheim House
1 Blenheim Road
Epsom
Surrey
KT19 9AP
Tel: + 44 (0)1372 722277
Fax: + 44 (0)1372 744477
www.evinoxenergy.co.uk
www.evinoxresidential.co.uk

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Facebook (Opens in new window) Facebook

Related

Previous Article

Ancon is honoured by HM The Queen ...

Next Article

JIS Europe

Latest Issue



[Click Here to view the Low Res PDF version]

<center>
© Copyright Design Buy Build. All rights reserved.
 

Loading Comments...
 

    MH Media Global uses cookies to ensure the best user experience. If you do not wish to allow cookies, please click refuse.AcceptRefusePrivacy Policy