Design Buy Build

Main Menu

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Sign in / Join

Login

Welcome! Login in to your account
Lost your password?

Lost Password

Back to login

logo

Design Buy Build

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Latest News
Home›Latest News›Impey installs luxury wetroom into a lift shaft at period property

Impey installs luxury wetroom into a lift shaft at period property

By Lauren Holmes
October 30, 2014
1357
0

Impey Showers, the UK’s leading wetroom specialist has completed a unique wetroom installation at Forde Abbey, a Grade One listed building and heritage attraction located in Dorset. Impey has dispelled the myth that contemporary design solutions for modern lifestyles can’t be incorporated into older properties by installing one of its wetrooms in an almost ‘impossible’ location; a disused lift shaft in a 900-year-old house.

Current Forde Abbey steward, Alice Kennard, had found leaking bathroom products to be one of her major concerns and problem areas affecting the extremely valuable decorative plaster ceilings.

A new wetroom was created within the space of a disused lift shaft using a number of Impey’s innovative, leak-free wetroom solutions.

Firstly, Impey’s Waterguard was chosen for this project to tank the wet-floor area because it guarantees a leak free solution which is crucial in a setting like Forde Abbey where original features and antique ceilings would be impossible to replace if damaged.

Impey Waterguard is the next generation in wetroom waterproofing systems as it ensures a faster and easier method to applying the membrane. Once the Waterguard is applied, the fleece membrane, which features a one-sided self-adhesive butyl rubber backing, does not need any curing time which means tiles can be laid straight away.

To add to this, Waterguard comes with pre-formed corners making the process even more straight-forward and time-efficient. It’s also extremely durable, consisting of a Copolymer based sheet that can be used with epoxy grout and solvent based sealers which are not suitable for bitumen-based waterproofing products.

Neil Whitehead, from Impey Showers, said: “Impey’s Waterguard created a watertight barrier which will ensure that no water escapes when the wetroom is in operation, so it was ideal for the job especially for a period property like this. The family did not want any more leaks and yet they needed somewhere to shower. The fact that you don’t need to leave Waterguard to cure was appealing too because it meant the tiles could be laid straight away, saving time and money.”

Impey’s Aqua-Dec EasyFit floor former was selected for installation into the new wetroom within a lift shaft as it is simple to use, supremely strong and reliable with a built-in 15mm gradient that requires no under boarding.

The Aqua-Dec EasyFit has a precise edge thickness of 22mm which allows it to slot alongside existing floor boards so that the wetroom floor doesn’t need to be manually formed.

Neil Whitehead from Impey Showers, continued: “Using the Aqua-Dec EasyFit floor former meant that we didn’t have to manually form the floor and this made the whole process of fitting the wetroom much quicker and simpler. It also turned out to be a much more cost-effective way of installing the new wetroom in a lift shaft!”

The Aqua-Dec EasyFit is also fitted with a unique, patent protected drainage feature which has a 360 degree rotating centre section, allowing joists and pipes to be easily avoided if they are obstructing the drain aperture. This can significantly reduce installation time and makes the process simpler to undertake.

The Kennard family are now enjoying their new wetroom. Alice Kennard, steward of Forde Abbey, said: “From a practical perspective, one of the best things about the Impey wetroom in the old lift shaft is that there  haven’t been any leaks, which is really important in this type of property.”

For more information about Impey Showers, go to www.impeyshowers.com or call 01460 256 080.

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Facebook (Opens in new window) Facebook

Related

Previous Article

Hansgrohe products save water and energy as ...

Next Article

Welsh Coastal Hotel Relies On Armstrong Service ...

Latest Issue



[Click Here to view the Low Res PDF version]

<center>
© Copyright Design Buy Build. All rights reserved.
MH Media Global uses cookies to ensure the best user experience. If you do not wish to allow cookies, please click refuse.AcceptRefusePrivacy Policy