Design Buy Build

Main Menu

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 76
      • Issue 75
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Sign in / Join

Login

Welcome! Login in to your account
Lost your password?

Lost Password

Back to login

logo

Design Buy Build

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 76
      • Issue 75
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Latest News
Home›Latest News›Kemmlit lockers specified for Brighton’s £3.5 million premier office refurbishment project

Kemmlit lockers specified for Brighton’s £3.5 million premier office refurbishment project

By Jamie Bullock
May 15, 2017
1163
0

Mocatta House is part of the Trafalgar Place flagship development in Brighton.

Named after David Mocatta the architect who designed the original building in the 1890’s and also Brighton’s Railway Station, Mocatta House has recently been refurbished at a cost of £3.7 million.

The building has been extended vertically by developers Faithdean to provide high end office accommodation including a new sixth floor and roof terrace.

Kemmlit R2Z lockers with electronic locks were specified by architects Morrow & Lorrainne for one of the main office suites.

The Type R2Z Locker System, which has a 20-year guarantee, utilises high quality 100% corrosion resistant aluminium for the locker carcass with a choice of two high quality door options – solid grade laminate finished in a special overlay to protect against scratching or a double shelled aluminium door with a ‘Crystal Coat’ stove enamelled finish.

For this project, 13mm solid grade laminate (HPL) doors with rounded edges were specified.

The Type R2Z locker from Kemmlit UK is part of a comprehensive range of high performance cubicle and locker systems offered by the company, designed and engineered for a wide range of applications and environments.

Kemmlit also provide a design and installation service.

www.kemmlituk.com

@Kemmlituk

This slideshow requires JavaScript.

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Facebook (Opens in new window) Facebook

Related

Previous Article

Interior Film from David Clouting proves a ...

Next Article

French entrepreneur Hélène Parisot launches in the ...

Latest Issue



[Click Here to view the Low Res PDF version]

© Copyright Design Buy Build. All rights reserved.
 

Loading Comments...
 

    MH Media Global uses cookies to ensure the best user experience. If you do not wish to allow cookies, please click refuse.