Design Buy Build

Main Menu

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 76
      • Issue 75
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Sign in / Join

Login

Welcome! Login in to your account
Lost your password?

Lost Password

Back to login

logo

Design Buy Build

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 76
      • Issue 75
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Latest NewsUncategorized
Home›Latest News›Kemper System Enables Barnsley Town Hall To Keep Heritage Intact

Kemper System Enables Barnsley Town Hall To Keep Heritage Intact

By Lauren Holmes
March 17, 2015
1113
0

With its Portland Stone façade and its classical architecture, Barnsley Town Hall is one of South Yorkshire’s most distinctive landmarks and best loved buildings.

When Barnsley Council commissioned a project to refurbish the roof as part of a programme of improvements to the building, Kemper System not only had to ensure that the roof was upgraded successfully without any disruption to council services but also had to complete the scheme without any impact on the rest of the building.

Explains Victoria Ramwell, technical sales representative of Kemper System: “The project involved installation of a new warm roof system to enhance the thermal performance of the building as well as providing a new waterproofing surface.

“The town hall remained occupied throughout the programme and the building not only involved challenges in terms of the roof build up and complexity but also has delicate features that we had to protect during the works, affecting the way in which the programme was designed.”

To address these challenges, the Stratex warm roof system with Kemperol 2K-PUR liquid waterproofing membrane was specified by Kemper System.  Kemperol 2K-PUR is solvent-free and odourless; ideal for use on occupied buildings where the odours from solvent based or so called low-odour products can be disruptive. Kemperol is also cold applied and therefore can be installed without hot works or the fire risk associated with them.

The existing roof build up consisted of asphalt, followed by a screed and a further layer of asphalt. Barnsley Council were keen to reduce the weight on the roof and so the top two layers had to be removed before installing the new roof.

The remaining asphalt surface varied in condition and a new vapour control layer had to be installed over large areas of the roof surface before installation of Kemper System’s Kempertherm insulation board.  A tapered insulation scheme was chosen to aid with rainwater drainage.

Stuart Hicks, marketing manager from Kemper System explains: “The Stratex system is designed to enable the installer to choose between mechanical or adhesive fixings for the insulation and initially the contractor planned to use mechanical fixings.

“However, it was clear when the installation team started to drill pilot holes that the vibration could cause damage to the internal décor and potentially the ornamental glass dome inside the building. As a result, adhesive was used to fix the insulation.”

As the level of the new insulation was above the lower edge of the glass on the large lantern rooflight, and so as not to interfere with the structure, a drainage channel was created around the roof light and lined with the Kemperol 2K-PUR membrane.

Stuart continues: “The complexity of the roof meant that it would have been extremely difficult to install a new waterproof surface with anything other than a liquid membrane.

“In addition to the roof light, above the internal glass ceiling dome, and the channel we had created around it, we had to contend with a high parapet wall and the outlets that come out of it, numerous skylights, a central plinth and two plant rooms on the roof.”

The Kemperol 2K-PUR liquid system enabled the contractor to install the waterproofing to the exact contours of these roof details and seamlessly incorporated all adjoining areas and drainage channels into a single monolithic membrane. Applied wet-on-wet in a single process, the liquid resin saturates a reinforcement fleece and cures to form a tough, flexible substrate that cannot delaminate. After completing the entire roof, red aggregate surfacing was applied to designated areas to create non-slip maintenance walkways.

“We needed a roof refurbishment that would improve the town hall’s thermal performance and protect against water ingress” comments Tony Taylor from Barnsley Council. “The solution from Kemper System not only answered these requirements but, being sustainably sourced and solvent-free, also conformed to our environmental objectives and ensured that we could carry on using the building as normal without any unpleasant odours or disruption.”

Visit Website: www.kemper-system.com

This slideshow requires JavaScript.

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Facebook (Opens in new window) Facebook

Related

Previous Article

CREATED FOR CRAFTSMEN BY CRAFTSMEN – WHY ...

Next Article

Formica® laminate is the inspiration behind Deadgood’s ...

Latest Issue



[Click Here to view the Low Res PDF version]

© Copyright Design Buy Build. All rights reserved.
 

Loading Comments...
 

    MH Media Global uses cookies to ensure the best user experience. If you do not wish to allow cookies, please click refuse.