Design Buy Build

Main Menu

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Sign in / Join

Login

Welcome! Login in to your account
Lost your password?

Lost Password

Back to login

logo

Design Buy Build

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Editors Choice
Home›Latest News›Editors Choice›Low Carbon, High Thermal Efficiency Pipe for Plymouth City Heating Scheme

Low Carbon, High Thermal Efficiency Pipe for Plymouth City Heating Scheme

By Lauren Holmes
August 27, 2015
2131
0

Flexenergy’s energy-saving Flexalen pipe was the ideal solution for Plymouth City Council when a new district heating scheme meant re-routing the pipe network from new gas boilers to serve offices in the Council House.

The Civic Centre, located alongside the Council House, had a gas boiler system which served the council offices. The Civic Centre is being serviced separately to enable its disposal for re-development. The Council House will now be fed from the new Guildhall boiler installation via the underground heating pipework.

Plymouth City Council specified Flexalen polybutylene pre-insulated pipe for the project – choosing the technology for its enhanced thermal properties, low embodied carbon, ease of installation and 50 year performance warranty. Contractors ECS have installed the network comprising of 31in no 12 metre lengths of pipework and 16 pre-fabricated bends, insulation kits and stub flanges.

Polybutylene is the only plastic pipe heat network system that can be fully fusion welded. This, together with its proven longevity, was a key factor in laying the 372 metres of pipe from the Guildhall, across a pedestrianised area to the Council House.

Moreover, the environmentally-friendly attributes of the pipe’s Pb technology and its low carbon manufacture, also helped meet sustainability goals, which were very important considerations given that the scheme is set to include biomass energy generation in due course.

Plymouth City Council expects the upgraded heating system to save £10,000 a year through energy efficiency, thereby optimising its whole life investment in district heating – savings achieved in part through Flexenergy’s environmentally-friendly, low carbon pipe technology and network design.

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Facebook (Opens in new window) Facebook

Related

Previous Article

SudsTech

Next Article

Manufacturers Team Up To Add Sparkle to ...

Latest Issue



[Click Here to view the Low Res PDF version]

<center>
© Copyright Design Buy Build. All rights reserved.
MH Media Global uses cookies to ensure the best user experience. If you do not wish to allow cookies, please click refuse.AcceptRefusePrivacy Policy