Design Buy Build

Main Menu

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 75
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Sign in / Join

Login

Welcome! Login in to your account
Lost your password?

Lost Password

Back to login

logo

Design Buy Build

  • Home
  • About Us
    • Rates & Data
    • Media Pack
  • Digital
    • Information
    • Latest Newsletter
  • Issues
    • 2025
      • Issue 75
      • Issue 74
      • Issue 73
      • Issue 72
    • 2024
      • Issue 71
      • Issue 70
      • Issue 69
      • Issue 68
      • Issue 67
      • Issue 66
    • 2023
      • Issue 65
      • Issue 64
      • Issue 63
      • Issue 62
      • Issue 61
      • Issue 60
    • 2022
      • Issue 59
      • Issue 58
      • Issue 57
      • Issue 56
      • Issue 55
      • Issue 54
    • 2021
      • Issue 53
      • Issue 52
      • Issue 51
      • Issue 50
      • Issue 49
      • Issue 48
    • 2020
      • Issue 47
      • Issue 46
      • Issue 45
      • Issue 44
      • Issue 43
      • Issue 42
    • 2019
      • Issue 41
      • Issue 40
      • Issue 39
      • Issue 38
      • Issue 37
      • Issue 36
    • 2018
      • Issue 35
      • Issue 34
      • Issue 33
      • Issue 32
      • Issue 31
      • Issue 30
    • 2017
      • Issue 29
      • Issue 28
      • Issue 27
      • Issue 26
      • Issue 25
      • Issue 24
    • 2016
      • Issue 23
      • Issue 22
      • Issue 21
      • Issue 20
      • Issue 19
      • Issue 18
    • 2015
      • Issue 17
      • Issue 16
      • Issue 15
      • Issue 14
      • Issue 13
      • Issue 12
    • 2014
      • Issue 11
      • Issue 10
      • Issue 9
      • Issue 8
      • Issue 7
    • 2013
      • Issue 6
      • Issue 5
      • Issue 4
      • Issue 3
      • Issue 2
  • Subscribe
  • Contact Us
Latest News
Home›Latest News›UFAC at 20 Soho Square on Track to Improve User Wellbeing

UFAC at 20 Soho Square on Track to Improve User Wellbeing

By Lauren Holmes
February 2, 2017
1129
0

AET Flexible Space, leading provider of underfloor air conditioning has recently completed the supply and commissioning of underfloor air conditioning equipment at 20 Soho Square in London’s West End.  The 6000 m2 neo-classical building has a stunning Portland stone façade; the most prominent in Soho Square and the iconic colonnade extends across the ground and first floors.  AET has supplied a total of twenty five CAM-C (DX) downflow units along with associated Daikin heat pumps and around 360 TU4-EC fan terminals; with the underfloor system installed throughout most of the building’s seven floors.

The recent refurbishment was a speculative re-development, however the property achieved notoriety in Q1 2016 by being rated the fourth biggest property transaction by size when Palantir Technologies UK Ltd acquired the whole 64,606 ft2 on a ten year lease at an average rent of £74 per ft2.  The incoming tenant has opted to finalise the fit out of the interior finish.

With underfloor systems, the whole plenum under the building’s raised access floor becomes the duct, or ventilation zone and each floor is divided into separate zones; ideal for multi-tenancy occupation or corporate division. Each of these zones is supplied with fully conditioned (chilled or warmed) air, which is fed into the plenum by the zonal downflow units (CAM), and then supplied into the workspace via Fan Terminal Units (Fantile).  The Fantile units feature integrated controllers where users can personally adjust fan speed and temperature to suit their own comfort; which can have a positive impact on user wellbeing.  Systems can be configured with underfloor or high level return and can easily integrate with passive or other ventilation systems.

Working with architect Buckley Gray Yeoman and consultant Hurley Palmer Flatt, the system specified at 20 Soho Square is a CAM-C Direct Expansion system.  The under floor void is split into supply and return air plena using easily relocatable, airtight baffle and air travels back to the CAM for re-conditioning via the return plena.  The Fantiles supplied are standard TU4 fan terminals with EC motors for enhanced energy efficiency, fitting neatly into the 270mm floor void. These can be easily re-positioned to suit individual tenant needs for heating or cooling, or when the interior layout may require change. Instead of a rooftop chiller providing chilled water, the building uses Daikin heat pumps to maximise space in the shallow roof space above the top floor.  The system is installed throughout the seven storey building with the exception of the ground floor and the seventh floor extension.

This historical building dates back to the 1800’s; initially housing musical instrument makers, D’Almain and Company. Soup makers Cross and Blackwell were based there from 1858, expanding into the premises from no. 21 next door.  In 1924-6, the original building was demolished and re-built by Cross and Blackwell as their headquarters building.  In 2002, the owner developer increased the building’s gross floor area by 16% by adding a new top floor on the roof of the existing rear extension.  At the same time, the office space was upgraded to full British Council for Offices (BCO) specification, including raised flooring and low energy displacement ventilation.  The latest refurbishment of the building has squeezed a few more inches of usable space and further modernised the services; removing the majority of the displacement ventilation system and incorporating direct expansion underfloor air conditioning by AET Flexible Space.

This slideshow requires JavaScript.

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Facebook (Opens in new window) Facebook

Related

Previous Article

Act before you scratch………

Next Article

Dart Valley Systems

Latest Issue



[Click Here to view the Low Res PDF version]

<center>
© Copyright Design Buy Build. All rights reserved.
 

Loading Comments...
 

    MH Media Global uses cookies to ensure the best user experience. If you do not wish to allow cookies, please click refuse.