1.0Design Buy Buildhttps://designbuybuild.co.ukJosh Holmeshttps://designbuybuild.co.uk/author/admin/Munters reduces maintenance and energy costs at Manchester Aquatics Centre - Design Buy Buildrich600338<blockquote class="wp-embedded-content" data-secret="qSKSkRYZ87"><a href="https://designbuybuild.co.uk/munters-reduces-maintenance-and-energy-costs-at-manchester-aquatics-centre/">Munters reduces maintenance and energy costs at Manchester Aquatics Centre</a></blockquote><iframe sandbox="allow-scripts" security="restricted" src="https://designbuybuild.co.uk/munters-reduces-maintenance-and-energy-costs-at-manchester-aquatics-centre/embed/#?secret=qSKSkRYZ87" width="600" height="338" title="“Munters reduces maintenance and energy costs at Manchester Aquatics Centre” — Design Buy Build" data-secret="qSKSkRYZ87" frameborder="0" marginwidth="0" marginheight="0" scrolling="no" class="wp-embedded-content"></iframe><script type="text/javascript"> /*! This file is auto-generated */ !function(c,l){"use strict";var e=!1,o=!1;if(l.querySelector)if(c.addEventListener)e=!0;if(c.wp=c.wp||{},c.wp.receiveEmbedMessage);else if(c.wp.receiveEmbedMessage=function(e){var t=e.data;if(!t);else if(!(t.secret||t.message||t.value));else if(/[^a-zA-Z0-9]/.test(t.secret));else{for(var r,s,a,i=l.querySelectorAll('iframe[data-secret="'+t.secret+'"]'),n=l.querySelectorAll('blockquote[data-secret="'+t.secret+'"]'),o=0;o<n.length;o++)n[o].style.display="none";for(o=0;o<i.length;o++)if(r=i[o],e.source!==r.contentWindow);else{if(r.removeAttribute("style"),"height"===t.message){if(1e3<(s=parseInt(t.value,10)))s=1e3;else if(~~s<200)s=200;r.height=s}if("link"===t.message)if(s=l.createElement("a"),a=l.createElement("a"),s.href=r.getAttribute("src"),a.href=t.value,a.host===s.host)if(l.activeElement===r)c.top.location.href=t.value}}},e)c.addEventListener("message",c.wp.receiveEmbedMessage,!1),l.addEventListener("DOMContentLoaded",t,!1),c.addEventListener("load",t,!1);function t(){if(o);else{o=!0;for(var e,t,r,s=-1!==navigator.appVersion.indexOf("MSIE 10"),a=!!navigator.userAgent.match(/Trident.*rv:11\./),i=l.querySelectorAll("iframe.wp-embedded-content"),n=0;n<i.length;n++){if(!(r=(t=i[n]).getAttribute("data-secret")))r=Math.random().toString(36).substr(2,10),t.src+="#?secret="+r,t.setAttribute("data-secret",r);if(s||a)(e=t.cloneNode(!0)).removeAttribute("security"),t.parentNode.replaceChild(e,t);t.contentWindow.postMessage({message:"ready",secret:r},"*")}}}}(window,document); </script> https://designbuybuild.co.uk/wp-content/uploads/2013/11/Untitled-12.jpg290290Munters, a global leader in energy efficient air treatment, has recently refurbished three Munters MX series desiccant dehumidifiers at Manchester Aquatics Centre.  The refurbishment involved replacing all major components, the old reactivation exhaust duct work and retrofitting the dehumidifiers with Munters Energy Recovery Purge (ERP) technology in order to reduce running costs by approximately 20% per year while preserving the building fabric and optimising comfort.